Location: |
Longmont, CO |
Openings: |
1 |
DUTIES & RESPONSIBILITIES:
Material Handling:
· Verify issued plastic material and dye against Quality file.
· Follow established procedures for handling and cleaning of autoloaders and drying equipment.
· Set up and cleaning of regrind equipment.
· Prioritize regrind equipment to maximize material usage for job by use of regrind when allowed by Quality file.
· Forklift Driver.
· Maintain a clean and safe work environment.
· Adhere to ISO standards.
· Adhere to company policies and procedures.
Molding Operations:
· Apply all methods and procedures to ensure a safe and efficient set up of molds from simple to complex molds.
· Set up and operation of Mold Temperate Controllers Chiller and Automation.
· Include in each set up, time to return all left over equipment, packaging, supplies, tools, water hoses, manifold controllers, last job material, purge material BEFORE any start procedures are applied.
· Set up for safe operation of Ultra-Sonic welding equipment.
· Set up for safe operation of other auxiliary equipment. (i.e., Hot manifold controllers, conveyers, drill press, arbor presses, air gate cutters)
· Apply Start Procedures, Restart Procedures and Last Part Procedure or End of Run Procedure as a daily practice.
· Identify root causes and process to trouble shoot and maximize run efficiencies.
· Set up Process Monitoring features to check process consistency of machine/operator repeatability.
· Monitor daily scrap rates with the goal of reduction of scrap.
· Perform new mold process development and any recommendations to improve the molding process.
· Record Hard copy set up sheets as well as updating electronic set up data as equipment allows.
· Perform production duties or break relief duties for the operators as required.
· Checking schedule and apply proper shut down methods to compliment material change over. Apply proper mold protection and cleaning before removal.
· Verify mold set up work.
Maintenance:
· Clean molds on daily startups, wipe down parting line at least once per shift. Apply lubrication to ejector pins, leader pins, lock blocks & angle pins daily.
· Performs bench mold disassembly and assembly for preventative cleaning and lubrication.
· Monitor preventative maintenance logs on all molding machines. Perform maintenance at required intervals and log request additional man power from supervisor, if required to complete in a timely manner.
· Perform basic machine diagnostics for typical heater related problems, fuses, thermocouple.
· Assists in new equipment set up or modifications of existing.
Equipment & Machines: Forklifts, Pallet Jack, Weight Counting Scales, Volt/Ohm Meter, Toyo Molding Machine (G2 control & H) JSW Molding Machine (ED Control), Kawaguchi Molding Machine (K1 Control), Manifold Controllers, Mold Temperature Controllers, Central Tower, Central Chiller, Air Compressor, Ultra-Sonic Welder, Drill Press, Regrind Equipment, Auto Loaders, Calculator, Trimming Knives, Gate Cutters and various hand tools.
Requirements:
· Ability to lift 55 pounds
· Ability to bend, reach & stoop
· Fork Lift Experience and/or Certification
· 2 Years Prior Injection Molding Set Up, Prior Plastic Material Handling Experience
· A minimum 3 years prior experience in plastics
· High School Graduate or GED
· Basic Math Skills
· Mechanical Knowledge is a plus!